Most viewed - Studio Build Diary |

IMG_7166.JPGDoorway end corner bracing1866 viewsThis caused some difficulty actually getting the doorway timber in situ - read the diaryamt
|
|

IMG_7168.JPGDoorway end corner bracing1849 viewsamt
|
|

IMG_7167.JPGBack wall and side wall bracing461 viewsAmazing how stiff this wall was after attaching the bracingamt
|
|

floor-wall-connection-01a.jpgConcrete floor434 viewsamt
|
|

studio-04a.jpgSectional view of basic structure346 viewsamt
|
|

studio-03a.jpgEarly Design Shot339 viewsamt
|
|

studio-07a.jpgTimber frame and drywall transparent333 viewsamt
|
|

IMG_6897.JPGBefore the work begins324 viewsamt
|
|

studio-06a.jpgTimber frame with acoustic isolation (Mineral Wool)319 viewsamt
|
|

studio-05a.jpgTimber frame only304 viewsamt
|
|

IMG_6898.JPGBefore the work begins302 viewsamt
|
|

IMG_7031.JPGEverything pretty well set for concrete295 viewsThe timber across is for tamping down. Two rails are attached to the side walls and locate into grooves at the ends of the tamper.amt
|
|
489 files on 41 page(s) |
1 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|