Top rated |

IMG_7892.JPG94 viewsamt     (1 votes)
|
|

IMG_7878.JPG121 viewsamt     (1 votes)
|
|

IMG_7687.JPG112 viewsamt     (1 votes)
|
|

IMG_7166.JPGDoorway end corner bracing1866 viewsThis caused some difficulty actually getting the doorway timber in situ - read the diaryamt     (1 votes)
|
|

IMG_7160.JPG160 viewsamt     (1 votes)
|
|

IMG_7131.JPGAll uprights and noggings secured158 viewsamt     (1 votes)
|
|

IMG_7073.JPG241 viewsamt     (1 votes)
|
|

IMG_7072.JPGDPM and foam strip trimmed203 viewsThis shows the finished result of the floor edges with the foam and DPM trimmed.amt     (1 votes)
|
|

IMG_7026.JPGFoam strips folded and taped242 viewsamt     (1 votes)
|
|

IMG_6972.JPG215 viewsFirst coat of liquid damp proof membrane above the level of the concrete flooramt     (1 votes)
|
|

IMG_6951.JPG210 viewsamt     (1 votes)
|
|

IMG_6937.JPGFirst batch of mortar dust201 viewsamt     (1 votes)
|
|
439 files on 37 page(s) |
 |
 |
 |
 |
 |
11 |  |
 |
 |
 |
|