Top rated |

IMG_8753.JPGAir-lock Layers82 viewsThe recessed layers are in place leaving a gap for my access panel. You'll see to the right the strips that fill the narrow gap between the joist and the studwork.amt     (1 votes)
|
|

IMG_8730.JPGRecessed Ceiling - Ready for Short Strips75 viewsThe second layer is pretty well in place apart from the short lengths to completely fill.amt     (1 votes)
|
|

IMG_8649.JPG99 viewsamt     (1 votes)
|
|

Ceiling_Void-01b.jpgNo Air Gap263 viewsamt     (1 votes)
|
|

IMG_8550.JPG87 viewsamt     (1 votes)
|
|

IMG_8536.JPGMulticore Feed Hole from Studio Side79 viewsamt     (1 votes)
|
|

IMG_8537.JPGMulticore Feed Hole from Garage Side80 viewsamt     (1 votes)
|
|

IMG_8541.JPGMulticore Running along Stud-work80 viewsA little difficult to see against the black background but the multicore is well clipped in situ.amt     (1 votes)
|
|

IMG_8543.JPGMulticore Trailing End83 viewsHere's where the trailing end of the multicore will enter the studio.amt     (1 votes)
|
|

IMG_8513.JPGChief Inspector91 viewsMy daughter ensuring that I meet current standards!amt     (1 votes)
|
|

IMG_8514.JPGBox with Holes Marked85 viewsamt     (1 votes)
|
|

IMG_8517.JPGSplitter Box Ready for the Lid85 viewsAssembled and ready for the lid to be glued and screwed on. The acoustic tile material has been glued and tacked in place.amt     (1 votes)
|
|
439 files on 37 page(s) |
 |
3 |  |
 |
 |
 |
 |
 |
 |
 |
|