Top rated |

IMG_8519.JPGThe Completed Splitter Box80 viewsThe box completely glued and screwed and ready to be fixed between the joists.amt     (1 votes)
|
|

IMG_8376.JPGFan and Duct 105 viewsThe fan temporarily mounted to allow testing.amt     (1 votes)
|
|

IMG_8186.JPGSocket Ring103 viewsThese are the two cables feeding the dado trunking. They will be fed under the floor to the fron t of the room.amt     (1 votes)
|
|

IMG_8190.JPG129 viewsamt     (1 votes)
|
|

IMG_7961.JPGDoor Frame Gluing163 viewsThe door frame strapped and glued.amt     (1 votes)
|
|

IMG_8176.JPGDAW position146 viewsThe DAW will be located between the outer wall and inner wall - behind the stud work here.amt     (1 votes)
|
|

IMG_8177.JPGDoor frame foot plate119 viewsThe footplate of the door frame screwed to the sole plate and the surrounding stud work.amt     (1 votes)
|
|

IMG_8178.JPGTop right corner of the door frame123 viewsThe two timbers to the right are in fact flush with each other with a small gap between - it looks as though the right hand one is set back - an optical illusion.amt     (1 votes)
|
|

IMG_7942.JPG161 viewsamt     (1 votes)
|
|

IMG_7955.JPG90 viewsThe door frame slotting together nicely. Constructed using the off-cuts from the ceiling joists. All that's needed now is for it to be glued and jigged up.amt     (1 votes)
|
|

IMG_7621.JPG131 viewsamt     (1 votes)
|
|

IMG_7626.JPG129 viewsamt     (1 votes)
|
|
439 files on 37 page(s) |
 |
 |
4 |  |
 |
 |
 |
 |
 |
 |
|